Have any questions? Feel free to contact us:
+233205636260
info@kema.gov.gh
27 Jul
WhatsApp Image 2023-02-24 at 2.04.59 PM
THE CURRENT SITUATIONS OF LAWOSHIEME FOOT BRIDGE
Category: Administration, KeMA, Plans
Lawoshieme foot bridge present circumstances desilting and dredging the waterways as well as building 4 concrete bridges to enable vehicle access to the towns.Funding is been sourc...
14 Jun
engineer and his Men on site
BATHYMETRY SURVEY AT THE FLOOD CONTROL GATE AND THE KETA LAGOON.
Category: Administration, KeMA, Plans
The flood control gate and the Keta lagoon were the sites of a bathymetric survey. figuring out the lagoon’s depth. To measure the lagoon’s depth and mud level, a surve...
27 May
WhatsApp Image 2023-02-24 at 10.23.30 AM (2)
REVENUE BARRIER AT ABOR
Category: Administration, KeMA, Plans
Revenue barrier at Abor: to help the Zonal recover some of the money that was lost.