Have any questions? Feel free to contact us:
+233205636260
info@kema.gov.gh
Posted by: Fred Addo
Category: Administration, KeMA, Plans
engineer and his Men on site

The flood control gate and the Keta lagoon were the sites of a bathymetric survey.

figuring out the lagoon’s depth. To measure the lagoon’s depth and mud level, a survey was conducted during the flooding season.

 

Author: Fred Addo

Leave a Reply