Have any questions? Feel free to contact us:
+233205636260
info@kema.gov.gh
16 Sep
WhatsApp Image 2024-01-11 at 9.42.46 AM
Keta Municipal Agriculture Department Launches Urgent Response to Bovine Tuberculosis: Veterinary Intervention and Targeted Treatment Campaign at Adzido Zongo
Category: Report
A farmer sought help from Keta Municipal Agriculture Department, reporting cattle with labored breathing and weight loss. Veterinary Officer diagnosed potential Bovine Tuberculosis...
01 Mar
WhatsApp Image 2023-03-01 at 9.56.44 PM
KETA MUNICIPAL ASSEMBLY LAUNCHES  BASIC RATES COLLECTION ( LAMPO)
Category: Administration, HR Department, KeMA
Today, March 1st, the Keta Municipal assembly declared March to be Basic Rate Collection Month. The program was launched during a brief event on the Assembly’s grounds by the...
21 Dec
MCEPRESENTING TO STEPH
PWD INCOME GENERATION SUPPORT DISBURSEMENT EXERCISE
Category: KeMA, Social Welfare, Uncategorized
In order to achieve the objective of mainstreaming the vulnerable, particularly persons living with disabilities into society, the Government of Ghana by law allocates a percentage...
27 Jul
WhatsApp Image 2023-02-24 at 2.04.59 PM
THE CURRENT SITUATIONS OF LAWOSHIEME FOOT BRIDGE
Category: Administration, KeMA, Plans
Lawoshieme foot bridge present circumstances desilting and dredging the waterways as well as building 4 concrete bridges to enable vehicle access to the towns.Funding is been sourc...
14 Jun
engineer and his Men on site
BATHYMETRY SURVEY AT THE FLOOD CONTROL GATE AND THE KETA LAGOON.
Category: Administration, KeMA, Plans
The flood control gate and the Keta lagoon were the sites of a bathymetric survey. figuring out the lagoon’s depth. To measure the lagoon’s depth and mud level, a surve...
27 May
WhatsApp Image 2023-02-24 at 10.23.30 AM (2)
REVENUE BARRIER AT ABOR
Category: Administration, KeMA, Plans
Revenue barrier at Abor: to help the Zonal recover some of the money that was lost.
02 May
Gamegah Swearing in
“Keta shall rise again” – Residents react to confirmation of MCE
Category: KeMA
The teams focused their efforts on a few of the highest-value S&OP levers in order to review the current planning process